The floodwater flow has once again increased to the Jurala project, located in the Jogulamba Gadwala district of Telangana. As a result, the project is managing the floodwater by lifting 23 crest gates to release water into Srisailam dam. The inflow was recorded at 1,30,000 cusecs, while the outflow reached 1,30,410 cusecs. A total of 434 MW of electricity is being generated in 11 units.