Excavation of the Srisailam Left Bank Canal Tunnel is progressing rapidly, with 100 meters completed toward the Mannevaripalle Outlet and 12 meters toward the Brahmagiri Inlet. Authorities said that drilling and blasting skills are being used, while locos remove soil and rocks. The project aims to enhance irrigation and water distribution across the region.