Power generation at the Srisailam Project has been halted as the reservoir water level reaches 44 TMC. Both Andhra Pradesh and Telangana have stopped production, with AP generating 2,060 million units on the right bank and TG 2,725 million units on the left bank in 10 months, which is the highest combined output since bifurcation.