The flow of floodwater into the Singur project, located in Singooru village near Sangareddy district of Telangana, has gradually decreased, prompting officials to close the crest gates. A total of 2,810 cusecs of water was released to TG Genco for power generation. Dam officials reported that while the project’s full capacity is 29.917 TMCS, the current storage level stands at 29.768 TMCS.