Hyderabad: 28°C
Telangana

Launched In May, Why Mumbai-Pune Link Shut?

The Mumbai-Pune Expressway “Missing Link” project is a newly opened 13.3 km stretch designed to bypass the risky Khandala-Lonavala ghat section and reduce travel time by about 25-30 minutes. However, it has been partially shut after a landslide triggered by heavy monsoon rain near a tunnel exit, disrupting traffic and raising safety concerns.